PROJECT BRIEF
This small, but challenging rear extension build in Wembley was close to a railway line and had limited access to the build site.
Aggressive clay soil and fruit trees meant foundations depth of 2.5m stepping to 1.8m had to be excavated along with claymaster sheets to the internal face of the foundation.
Concrete was pumped through the already decorated property.
DSJ Build was responsible for all groundwork’s, foundation dig and fill, construction of walls with roof structure with fibreglass roof covering.